How does this works?
- Register a “Homeowner account” on the Ministry of Renovation (MOR) website portal (www.mor.sg).
- Click on the “Get Promo” Button on this screen and type “KRSPKG” and Sent.
- Alternatively, you can also WhatsApp : “KRS PKG” to “9092 0775”.
- MOR Designer will get in touch with you within the next few working days.
Log on to : www.mor.sg
Kitchen Package @ $25,888 (HDB-RESALE)
-PRELIMINARIES
- Submission to HDB for Hacking, Replacement of windows, ETC. (Exclude Professional Engineer (PE) if require by HDB)
- To provide labour / material for General Cleaning to Kitchen
- Clearing of Debris, Supply of Sand, Upload of materials
- Floor protection by corrugated fibreboard
- Provide 3D for on Carpentry (Max 1 drawing)
- Submission Licence Plumber (LP) Endorsement to PUB
-HACKING & DEMOLITION WORKS
- Hack off existing floor and wall tiles at Kitchen
- Dismantle all Kitchen Cabinet, Kitchen Sink, Hood and Hob at Kitchen
-MASONRY WORKS
- Construct kitchen mortar base complete with Side tiling works
- Construct fridge base complete with Full tiling works
- To supply labour & material to lay 2-Step K-11/104 water proofing
- To Supply Labour to do cement screeding for Kitchen Floor
- To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles at kitchen.
- Supply Labour to do cement screeding for Kitchen Wall
- To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Kitchen Wall.
-CARPENTRY WORKS
- Design and fabricate (L) 10 Ft Bottom and (L) 10 FT Top Kitchen Cabinet c/w free soft close hinges for Cabinet Door
-SOLID SURFACE
- Supply labour & material to install Solid Surface at Kitchen Top c/w Back splash (10 FT)
-PLUMBING WORKS
- Supply labour to install Stainless Steel piping (Cold) at Kitchen
- Supply labour to install 1 set of Kitchen Sink and Tap at Kitchen
-PAINTING
- Supply labour and materials using NIPPON PAINT to paint Kitchen Ceiling
-Professional Consultation Fee
- MOR Professional Consultant Fee (Design Consultation + Project Documentations + All Warranties Support)
Terms and Conditions:
- This package is strictly Not allow to combine with other promotion.
- In the event of additional items during the renovation, “Service Fee” is chargeable for the renovation.
- Consultant Fee and Service Fee will base on MOR Plan template.
- Package does not include:
- items not state in the Package
- Public Liability Insurance
- If Owner is staying in and require pro-rate renovation, the cost will be increase by:
- $1,200 for 2 Pro-rate
- $1,800 for 3 Pro-rate
- Ministry of Renovation reserves the rights to change or amend the above terms & conditions without prior notice.
Promotion ends on 31 Dec 2023.