How does this work?
1. Register a “Homeowner account” in the Ministry of Renovation (MOR) website portal (www.mor.sg).
2. Click on the “Get Promo” Button on this screen and type “BTO4PKG” and Sent.
3. Alternatively, you can also WhatsApp: “BTO4 PKG” to “9092 0775”.
4. MOR Designer will get in touch with you soon within the next few working days.
Log on to: www.mor.sg
BTO 4 Room Package @ $19,888 (HDB)
-PRELIMINARIES
- Submission to HDB for Hacking, Replacement of windows, ETC. (Exclude Professional Engineer (PE) if require by HDB)
- To provide labour / material for General Cleaning to whole house
- Clearing of Debris, Supply of Sand, Upload of materials
- (Payable to Site-Contractors est. $1000- $2000)
- Floor protection by corrugated fibreboard
- Provide 3D for on Carpentry (Max 4 drawings)
- Submission Licence Plumber (LP) Endorsement to PUB
-PLUMBING WORKS
- Supply labour to install 2nos of Instant heaters / 1 Storage Tank Heater
- Supply labour to install toilet accessories at 2 bathrooms
- Supply labour to install 1 set of Kitchen Sink and Tap at Kitchen
-MASONRY WORKS (Tiles By Owner)
- Construct kitchen mortar base complete with Side tiling works
- Construct fridge base complete with Full tiling works
- Construct washing machine base complete with Full tiling works
-CARPENTRY WORKS
- Design and fabricate (L) 10 Ft Bottom and (L) 10 FT Top Kitchen Cabinet c/w free soft close hinges for Cabinet Door
- Design and fabricate (L) 5 FT X (H) 8.5 FT Full Height Casement Wardrobe in Master Bedroom
- Design and fabricate (L) 5 FT X (H) 8.5 FT Full Height Casement Wardrobe in Bedroom 2
- Design and fabricate (L) 5 FT X (H) 8.5 FT Full Height Casement Wardrobe in Bedroom 3
-SOLID SURFACE
- Supply labour & material to install Solid Surface at Kitchen Top c/w Back splash (10 FT)
-CEILING WORKS
- Supply and erect false ceiling or L-box at Living and dining area
- Supply and erect false ceiling at foyer and passage-way
-PAINTING
- Supply labour and materials to paint whole unit using Nippon V5000 emulsion paint (Max 5 + 1 Colour)
-Professional Consultation Fee
- MOR Professional Consultant Fee (Design Consultation + Project Documentations + All Warranties Support)
Terms and Conditions:
- This package is strictly Not allow to combine with other promotion.
- In the event of additional items during the renovation, “Service Fee” is chargeable for the renovation.
- Consultant Fee and Service Fee will base on MOR Plan template.
- Package does not include:
- items not state in the Package
- Public Liability Insurance
- If Owner is staying in and require pro-rate renovation, the cost will be increase by:=
- $1,200 for 2 Pro-rate
- $1,800 for 3 Pro-rate
- Ministry of Renovation reserves the rights to change or amend the above terms & conditions without prior notice.
Promotion ends on 31 Dec 2023.