Home

Promo

Get Quo

Post Project

Company Promotions

Check Out LATEST RENOVATION Promotions and SAVE UP MORE on your RENOVATION COST!

2 Bathrooms Package @ $19,888 (HDB)

2 Bathrooms Package @ $19,888 (HDB)

Ministry of Renovation

How to Redeem?

To redeem this promotion, follow these simple steps:

  1. Register a “Homeowner account” on the Ministry of Renovation (MOR) website portal (www.mor.sg).
  2. Click on “Get Promo” Button on this screen and type “2B_PKG” and Sent.
  3. Alternatively, you can also WhatsApp : “2B_PKG” to “9092 0775”.
  4. MOR Designer will response back to you and arrange for a meeting.

 

2 Bathrooms Package @ $19,888 (HDB)

-PRELIMINARIES

  1. Submission to HDB permit for Hacking, Replacement of windows, ETC. (Exclude Professional Engineer (PE) if require by HDB)
  2. To provide labour / material for General Cleaning to 2 Bathrooms
  3. Clearing of Debris, Supply of Sand, Upload of materials
  4. Floor protection using corrugated fibreboard
  5. Not include 3D drawings on carpentry work
  6. Submission of Licence Plumber (LP) permit Endorsement to PUB

-HACKING & DEMOLITION WORKS

  1. Hack off existing floor and wall tiles at 2 Toilets
  2. Dismantle 2nos. of existing 2 Toilets Doors
  3. Hack off existing toilet Water Closet (WC), Wash Basin (WB), Water heater and Accessories at 2 Toilets

-MASONRY WORKS

  1. To supply labour & material to lay 2-Step K-11/104 water proofing at Master Bathroom Floor
  2. To supply labour to do cement screeding for Master Bathroom Floor
  3. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy-duty homogeneous tiles at Master Bathroom.
  4. Supply Labour to do cement screeding for Master Bathroom Wall
  5. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Master Bathroom.
  6. Construct Entrance kerb/Step Down/Ramp at Master Bathroom Entrance
  7. To supply labour & material to lay 2-Step K-11/104 water proofing at Common Bathroom Floor
  8. To supply labour to do cement screeding for Common Bathroom Floor
  9. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy-duty homogeneous tiles at Common Bathroom.
  10. Supply Labour to do cement screeding for Common Bathroom Wall
  11. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Common Bathroom.
  12. Construct Entrance kerb/Step Down/Ramp at Common Bathroom Entrance

-PLUMBING WORKS

  1. Supply labour to install Stainless Steel piping (Cold) at 2 Toilets

> Separate Toilet add $280

  1. Supply labour to install 2nos of Instant heaters
  2. Supply labour to install toilet accessories at both bathrooms
  3. Supply labour to install 2nos of WC in Both Bathrooms
  4. Supply labour to install 2nos of Basin and Taps in Both Bathrooms (w/o cabinet)
  5. Supply labour to install 2nos of Spray Gun in Both Bathrooms

-ALUMINIUM

  1. Fabricate and install 2nos of (L) 3 FT X (H) 7 FT Bi-Fold Door in Master & Common Bathrooms

-PAINTING

  1. Supply labour and materials using NIPPON PAINT to paint 2 Toilets Ceiling

-Professional Consultation Fee

  1. MOR Professional Consultant Fee

(Design Consultation + Project Documentations + All Warranties Support)

 

Terms and Conditions:

  1. The package includes all specified renovation works and services outlined in our promotion package, such as design consultation, materials, and labour (subject to terms).
  2. This promotion is available to all homeowners planning a renovation for their residential property within Singapore.
  3. This package cannot combine with any other promotions.
  4. In the event of additional items and/or alteration during the renovation, items will be charged respectively.
  5. Consultant Fee and Service Fee plan do not apply to package and will be based on the MOR Plan template separately.
  6. Promotion is valid from 1 Jan 2025 – 31 Dec 2025.
  7. Package does not include:
    • Items not stated in the package
    • Public Liability Insurance (subject to site and compensation)
    • Electrical Works
    • Kitchen Appliances – Hood / Hob / Oven / Etc…
    • Bathroom Accessories – Sink / Taps / Etc…
    • Lighting Accessories – Ceiling Light / Downlight / Ceiling Fan / Etc…
  8. If Owner is staying in and require pro-rate renovation, the cost will be increase by:
    • $1,200 for 2 Pro-rate
    • $1,800 for 3 Pro-rate
  9. Ministry of Renovation reserves the rights to change or amend the above terms & conditions without prior notice.

 

 

WhatsApp MOR @ 9092 077 or Email to sales@mor.sg to book a consultation.

 

Visit here to view other MOR promotions.

 

Promotion ends on 31 Dec 2025.

Copyright © 2021 Ministry Of Renovation. All rights reserved.

Chat on WhatsApp